Dates
October 2021 – January 2023
Project Value
$13.82M
Project Overview

Gowanus Canal CSO Facility Preparation

Commercial building dismantlement across multiple lots within a highly populated urban area.

Gramercy performed demolition and site preparation services for the construction of the Gowanus Canal Combined Sewer Overflow (CSO) Facility. The project involved commercial building demolition across multiple lots within a highly populated urban area while protecting and monitoring adjacent structures, including the Gowanus Canal bulkhead. Work also included utility disconnections, historic façade preservation and salvage, installation of below-grade concrete and geosynthetic systems, environmental remediation, and preparation of the site for future construction activities.

Execution Scope

Site Conditions

  • Commercial Building Demolition across Multiple Lots in Urban Area
  • Protection and Monitoring of Adjacent Structures, including Gowanus Canal Bulkhead
  • Approvals by New York City Department of Buildings (NYCDOB)

Scope of Project

Civil

  • Restoration of Sidewalks to Remain
  • Installation of Concrete & Rebar at Below-Grade Voids/Structures
  • Installation of Geosynthetic & Geomembrane Materials over Existing Slabs
  • Historic Preservation & Salvage of Building Facade Materials (i.e. bricks, bluestone, terracotta, etc.)

Demo

  • Full Structure Demolition of (5) Commercial Buildings across (3) Lots
  • Disconnect/Cap Existing Utilities (water, sewer, electrical, etc.)

Environmental

  • Lead
  • Asbestos Containing Material (ACM)
  • Universal Waste (bulbs & ballasts)
  • Abatement & Removal of Underground Oil Storage Tanks