MADISON YARDS SITE CLEARANCE

Project

MADISON YARDS SITE CLEARANCE

Project
Madison Yards Site Clearance
Delivery
Bid-Build (BB)
Client
NYC Metropolitan Transit Authority (MTA)
Client Rep.
Rudy Batista (212) 736-4444
Dates
January 2009 - April 2011
Value
$42.4M
Project Overview

MADISON YARDS SITE CLEARANCE

Demolition and reconstruction of tracks, crash walls, and commissary areas.

PROJECT: Madison Yards Site Clearance

Execution Scope

Site Conditions

  • Bid-Build Delivery Method
  • Site Clearing in Urban Environment
  • Protection and Monitoring of Active Railroad
  • Coordination with NYC Metropolitan Transit Authority (MTA)
  • Approvals by NYC Metropolitan Transit Authority (MTA)

Scope of Project

Civil

  • Installation of New Concrete Crash Walls
  • Reroute Sewer Main and Install HDPE Drainage Pipe
  • Construction of new Commissary and Bathrooms

Demo

  • Saw Cut 2,000 LF of Existing Concrete Crash Walls
  • 18,000 LF of Rail and Ties
  • Removal of Uncontaminated Track Ballast
  • Demolition of Existing Train Platforms, and Water and Sewer Lines
  • Utilized Hydraulic Excavators

MEP

  • Installation of Permanent HVAC Systems and Fire Alarms
  • Installation of Temporary Ventilation Systems
  • Installation of New Lighting System

Environmental

  • Lead
  • Asbestos Containing Material (ACM)