ADA Elevator Installation
59th St, 4th Ave. Station

Project

ADA Elevator Installation 59th St, 4th Ave. Station

Project
A-37124: Installation of (3) Elevators at the 59th Street, 4th Ave Line Station (BMT)
Delivery
Design-Bid-Build (DBB)
Client
MTA – New York City Transit
Client Rep
Rajendra Shah (646) 252-2231
Dates
September 2018 – January 2021
Project Value
$43,487,000
Project Overview

ADA Elevator Installation at 59th Street Station

The project included the installation of three new ADA hydraulic elevators at the 59th Street, 4th Avenue subway station in Brooklyn, providing full accessibility improvements within an active transit station environment.

Construction activities were performed within densely populated residential neighborhoods and alongside active railroad operations requiring extensive coordination with local businesses, municipal events, and transit operations.

The team successfully achieved two early finish milestones, including substantial completion nine months ahead of schedule.

Execution Scope

Site Conditions

  • Active Transit Station
  • Densely Populated Residential Neighborhood
  • Right of Way (ROW) Work on Active Railroad
  • Coordination with Local Businesses and Municipal Events (NYC Marathon)
  • Achieved Early Finish Milestones Including Substantial Completion 9 Months Early

Scope of Project

Civil

  • (3) New ADA Hydraulic Elevators
  • New ADA Stairs
  • Mezzanine Expansion
  • Concrete Superstructure
  • Electrical and Communication Systems
  • AFC Replacements
  • Public Restrooms
  • Structural and Ornamental Steel
  • Utility Relocations: Water, Sewer, Gas and Electric

Demo

  • Selective Demolition
  • Major Structural Component Replacement
  • Across Active Railroad

Environmental

  • Lead Abatement
  • Asbestos Containing Materials (ACM)
  • Contaminated Soil